Mansfield Dam - Lake House Update
As we finalize the design and move into the construction document phase, we are very enthusiastic to share a small update and site photos...
Apr 18, 20231 min read
10 views


Horseshoe Bay - Water House Update
Today, we re-visited the site, to better study the existing topography, site drainage, trees and progress on the boat canal extension.
Apr 13, 20231 min read
9 views


Lakeway Lease House - Roof Update
Roofing completion on the Lakeway lease house project.
Mar 11, 20231 min read
11 views


Spring Update - Completed and Upcoming Projects
As spring starts to warm up the air... flowers are blooming, the lake water is (slowly) rising and folks are ready to build!
Mar 8, 20232 min read
10 views


Lakeway Lease House - Foundation (House) Update
Today we observed the finished slab, including anchor bolt locations and the areas with a broom finished.
Oct 19, 20221 min read
15 views


Lakeway Lease Home - Slab Update
Exciting progress to share! Today we observed the concrete foundation being set in place.
Oct 18, 20221 min read
1 view


Big Horn - Site Prep
On this beautiful day, we observed the placement of silt fences and erosion control on the Big Horn site.
Oct 17, 20221 min read
10 views


Lakeway Lease House - Rebar and Foundation Update
Today, we observed some of the rebar progress on both the house and garage. This included rebar ties, stirrups, chairs and waterproofing.
Oct 13, 20221 min read
6 views


Lakeway Lease House - Underground Plumbing and Electrical
Underground construction involves more than just buried conduit and plumbing lines. It requires coordination between several trades.
Sep 9, 20221 min read
4 views


Lakeway Lease House - Foundation Updates
Today we photographed the foundation progress, including the formation of interior grade beams and waterproffing.
Sep 4, 20221 min read
8 views


Lakeway Lease House - Foundation Start
Rough grading started this week along with temporary formwork for the concrete foundation.
Aug 22, 20221 min read
6 views


Motif Articles: Residential Fire Suppression - NFPA 13D Systems
NFPA 13D is a residential sprinkler design standard focused on one- and two- family dwellings and manufactured homes.
Aug 20, 20227 min read
9 views


Lakeway Lease House - Mobilization and Site Update
Site mobilization, foundation stake out and temporary power on site.
Aug 18, 20221 min read
8 views


Motif Articles: Austin McMansion Requirements
The "McMansion" regulations, were designed to minimize the impact on surrounding properties in residential neighborhoods.
Aug 16, 20224 min read
20 views


Motif Articles: Austin Energy Primary and Neutral - Power Pole Clearance Requirements
How to design your custom home, with proper documentation and clearances around existing utility poles in the Austin area.